Use cases
Plan work with your team
Build a shared project workflow with lists, assignees, checklists, status views, discussions, and deliberate review.
v0.3.0 referenceReviewed
On this page
Use this workflow for a small product team, an internal operations group, or a community project that wants a shared view of work without requiring a vendor account for the core application.
Set the permission boundary first
Create a workspace for people who should share access. Add existing Hopya accounts through Workspace settings and choose appropriate roles. Use separate workspaces when access must be separate; a folder is organization, not a new security boundary.
Keep an active Owner and review task, document, Table, and comment permissions separately. Site-administrator access does not bypass workspace membership.
Create a project and clear destinations
Create a project such as Release planning, then lists such as Engineering, Design, and Operations. A task belongs to one list. Folder/project selection includes descendant lists, while All tasks combines the selected workspace.
| Workflow choice | Rule |
|---|---|
| Defaults | To do, Backlog, In progress, Review, Done |
| Completion | Explicit when customizing statuses |
| Remove a used status | Move affected tasks first; removal otherwise rejected |
| Project-owned list | Inherit or override project statuses |
| Standalone list | Explicit own statuses |
Capture work that can move forward
Give each task a concrete title, one accountable assignee when appropriate, and enough body context to avoid another meeting. Use a checklist for small steps and subtasks when the work needs separate task records.
Optional fields can capture estimates or references.
| Field action | Data impact |
|---|---|
| Hide/unassign | Saved values retained |
| Delete definition | Saved values removed; export important data first |
Review from the right perspective
| Question | Useful view |
|---|---|
| What is the next action and who owns it? | List |
| Where is work waiting? | Board |
| What is due on a particular date? | Calendar |
| Which task has the visual material? | Gallery |
| How do start and due dates overlap this month? | Timeline |
Board work can move through its Move to control without dragging. Timeline is a date-span view, not a dependency scheduler or critical-path planner. Due dates are calendar dates, not a promise of timed reminder delivery.
Keep discussion attached to the work
Use threaded comments for decisions.
| Shortcut / action | Result |
|---|---|
@ member / task assignment | Inbox notification |
@@ task | Navigation link, no user notification |
@@@ structure | Navigation link, no user notification |
You can upload private images into task bodies and comments. Write a description that explains the image’s purpose, not just its filename. URLs remain permission-checked and are not public sharing capabilities.
Close the loop without losing drafts
If a save conflicts with another edit, preserve your draft, read the current record, and reapply only the intended change. Do not retry a stale write blindly.
Archive completed work when appropriate. Archive and deletion are different: deletion is permanent and there is no promised undo. Full workspace exports include archives; complete backups are still needed for recovery.
Read the full user guide for keyboard interaction, filters, custom fields, and the exact account/workspace settings boundaries.